4.2.4. Results

Figure 5 shows that the implementation of mitigation actions in the transport sector yields a net benefit of $8.3 billion compared to the BAU scenario.

Models used on the cost and benefits analysis

Figure 5: : Preliminary results for the Transport sector: (a) costs of the BAU and LTS scenarios, and (b) benefits of implementing the LTS -cost difference between the BAU and LTS scenarios-.